MYE received the geometry of the wheelhouse furniture and designed all the equipment that this should carry, the specifications and the location of each equipment. At the same
time, the layout of the screens and the monitoring functions that they should display were also designed. It evaluates the access and refrigeration of the electronic equipment that is inside the
furniture, as well as its distribution before installing them. Also the electrical boards that were in the front were designed.